00:00Mechanical type or compression connectors from the cod surface.
00:10Thank you for your interest in the Burnie KCKF bulkhead connector.
00:15Today, we'll be installing a KCKF onto a metal enclosure with two conductors.
00:20Make sure you have all appropriate safety gear tools and equipment for the installation.
00:25First, consult your Burnie literature to determine the appropriate through hole size for
00:30your connector. Remove the cover of your enclosure and drill a
00:34hole matching the size of your connector disassemble the
00:40KCKF. As shown
00:54note the male side and female sides of the connector starting with the
01:00female portion, place your grounding conductor in the connector and hand tighten under the
01:05pressure bar. Next, remove the nut and pressure bar assembly
01:09if necessary for the male portion of the connection, install the stainless steel washer,
01:15followed by the rubber washer and insert into the through hole,
01:32hold the mail portion in the hole and install the stainless steel washer.
01:36Followed by the stainless steel lock washer
01:46position, the female side with a threaded screw and spin the male side until hand tight.
02:00A key component to attaining Nema four X rating is tightening the components down to the
02:05specified torque ratings with your bury torque, wrench torque,
02:09the connector to the enclosure using the torque specified in the documentation.
02:15Finally install your external ground connector and tighten to the appropriate torque
02:41repeat for internal connection.
02:52Your KCKF connector is installed for more information.
02:56Visit bernie.com. Thank you.