00:00To install Atlas resistance piers.
00:02The ground is first excavated to expose the foundation's footing.
00:07The footing is then notched to allow the bracket to be mounted directly under the wall.
00:12The drive stand is attached to the bracket and the pier sections are pushed into the ground
00:16until a predetermined load or resistance is achieved.
00:19Or structure lift occurs.
00:21The starter section has a collar attached to its tip to minimize friction and transfer the
00:26load to soil or rock.
00:28Resistance is determined with a calibrated pressure gauge.
00:31Once the required resistance is achieved, the drive stand can be moved to the next pier to be
00:36installed with all pier. Installed lift heads are attached to the
00:39brackets and all the piers are loaded simultaneously to lift the structure.
A brief overview of the steps to install Atlas Resistance Piers for foundation residential foundation remediation.